With the concrete bath dry, it was time to break the mould and move the heavy tub out of Ed's workshop and into the principal bedroom.
It takes all our manpower to haul the heavy bath through the door and into the room.
Our first chance to see the form of the bathtub. |
Strong ropes are required to lift it. |
The tub is lowered carefully onto the brick pedestal. |
A check is made to ensure it is level. |
David applies cement to the base to cover the bricks. |
The bath is installed to allow plenty of tiled floor on the access side. |
We think our guest will love relaxing in the bathtub, taking in the view.
No comments:
Post a Comment