June Donaldson and Edward Garry live at an altitude of 2,600 metres in Mosoj Llajta, Yotala, 20 minutes from the colonial city of Sucre in Bolivia, South America. Using earth and stones from the land, we have sculpted beautiful buildings which compliment the high desert landscape and incorporate creative and innovative elements of design.

We have designed a high quality hotel in Sucre for guests who want to get off the treadmill of travelling from city to city in South America. At Sky Hacienda you can dictate your own timing and choose how to enjoy your stay, whether it is doing very little or exploring the best that the Andes in Bolivia has to offer.

29 December 2011

JACUZZI MOSAIC WORK - DONE!

The decision to embark on a mosaic project for our large outdoor jacuzzi could have been seen as a crazy one.  Ed and I had no time to devote to the precision and continuous application required, so we decided to train our Workaway volunteers.  We chose the tile colours and drew out the design, showed how to break the tile, mix the adhesive to the correct consistency, stick it to the walls flat with no huge gaps and no tiny pieces, mix the grout, fill the cracks and then wipe it off to create a smooth finish.
Sina works on one of our fun fish.
The concentration is intense!
Soon the walls are completed and only the rim is left to do.
The grouting of the rim is still to be done but the jacuzzi looks beautiful.
Plenty of room for a few guests on the seat.
A good view of the fish.
Sina is so happy to be the one to finish the mosaic work.
Our volunteers did such a great job, with none of them having any experience of this kind of work.  We still had a bit of finishing work to do with the taps, the installation of a pump for the air jets and the solar heating system that we had planned.........

27 December 2011

CHRISTMAS 2011



Christmas is always a challenge when family and friends are so far away.  But as the song goes - "If you can't be with the one(s) you love, love the one(s) you're with".

Our volunteers Sina and Sky are staying with us over the holidays and they helped us decorate the living room. 
Sky decides to decorate himself.

On Christmas Eve our caretaker Carmello, his wife Lydia and their children Jose Miguel, Mariana and Adriana visit us to the see the fairy lights and to receive their presents.

On Christmas Day we prepare food for the barbecue.  Sina is vegetarian, so we make veggie kebabs.


They look pretty good!
Sky loads the barbecue.
The day is made complete by being able to talk to our loved ones now that we have a fixed landline.  If we could have transported them over to Bolivia the day would have been perfect!



19 December 2011

TERRACING ON THE POOL SIDE

After their great work on the dry stone wall that formed the terrace in front of the bedrooms, Rosando and Marcello moved to the other side of the Roundhouse, above the pool.  Although we had stopped the wind blowing the dust into the pool from the prevailing northerly direction by building the pool wall, we still had the occasional storms from the south.  So we set to work terracing the slope that ran down the side of the pool to contain the muddy water that ran down the slope during the rainy season.  Grassing the area adjacent to the pool would prevent mud splashing into the water in heavy rainstorms.

Our team construct the steps in the wall.
The wall is backfilled with rubble and small stones.
Ed and Carmello help haul a huge stone into place on the back wall of the terrace.
A mixture of leverage and brute force is required.  
Our workers leave for their 2 week break for Christmas.  On their return in the new year they will finish up the walls and prepare the ground below the terrace for grass sowing to take advantage of the highest months of rainfall in January and February.

15 December 2011

THE BATHTUB 2

With the concrete bath dry, it was time to break the mould and move the heavy tub out of Ed's workshop and into the principal bedroom.
Our first chance to see the form of the bathtub.
Strong ropes are required to lift it.
It takes all our manpower to haul the heavy bath through the door and into the room.


The tub is lowered carefully onto the brick pedestal.
A check is made to ensure it is level.
David applies cement to the base to cover the bricks.

The bath is installed to allow plenty of tiled floor on the access side.
 We think our guest will love relaxing in the bathtub, taking in the view.

13 December 2011

THE COOKER HOOD

With the mezzanine floor completed, Ed was able to work on a design for installing the cooker hood over the hob.  We had discussed the possibility of hanging it from chains from the beams, but felt that they would intrude on the clean lines of the living room interior.  So when we were designing the layout of the mezzanine, we deliberately matched the outside edge above where the hob would be installed.  By doing this we could suspend the cooker hood from the mezzanine to line up above the hob.

Ed welded a frame from the metal band around the extraction pipe on the outside edge of the mezzanine.

It looked rather precarious to me at the time, but I was assured that the structure was strong enough to support the cooker hood.
And sure enough it was still hanging there the following morning and works fine!
Of course, as with all things, it requires further work - a stainless steel cover where the hood would normally be fitted against the wall, and casing in the metal support structure.

06 December 2011

THE MEZZANINE FLOOR

It seemed like an eternity since the mezzanine floor had been started - the supporting beams had been installed during the building of the thick adobe walls a year and a half ago.  We worked hard on the design of the floor area, narrow at the top of the floating staircase, past the door to the roof terrace then opening up to provide a sitting area, before narrowing again above the main entrance door, then widening again to give a good space for the office over the kitchen.

Ed had faced the outside edge of the beams with curved steel and then made a banister to match the curve, glueing thin strips of plywood together.  He then installed thick cables from the roof beams through the bannister to the curved steel frame below.  Narrow steel uprights would be welded to the steel frame and slotted into the bannister above, but this could not be done until the flooring had been completed.

The installation of the flooring was a challenge from the start.  Although Ed had done tongue and flooring before the complicated design of the mezzanine space meant that it would not be a quick job......and Ed had a list pages long of other work to be completed....None of our workers had any knowledge of carpentry, and the wood flooring we had seen in Sucre was not of the standard we required. 

So we advertised on the Workaway work exchange site for an experienced carpenter whilst we made endless trips to Sucre trying to locate the necessary tongue and groove flooring planks.  We had so many false leads and promises of deliveries that didn't materialise (all too common in Bolivia) that we were overwhelmed with joy when we found enough dry flooring for the mezzanine.  Even better, we had an English carpenter from Workaway lined up to arrive imminently.

We discovered very quickly that first world carpenters and third world materials don't work.  Our volunteer complainted bitterly and consistently about the quality of the wood which, to be fair, was not good by British standards.  But we thought that an experienced carpenter would be able to overcome the challenges of third world standard wood.  After a week of continuous vocal frustration he threw in the towel, having only completed a quarter of the floor space.   So it was down to Ed to finish the floor.

Some planks were better than others, and although we had asked the carpenter to mix up the different grades, he used all the best wood.  Ed was left with the sub-standard wood and a lot of space to cover.

Mind the gaps!
The arrival of new volunteers, including 19 year old Sky from Canada, was a blessing.  With very little experience of woodworking, Sky set to work as Ed's assistant.
The work proceeded smoothly and efficiently with no complaining.  Before too long the flooring was nearly completed.
Ed and Sky work well together making the pieces fit as the wood stock gets low.
Ed places the last piece of the jigsaw in the floor.
Done!  Hurrah!
 Being able to walk around the mezzanine gives us a new perspective on the views outside.