Work starts on the pool wall. It will provide shelter from the prevailing wind and much needed shade from the fierce high altitude sun.
Windows are installed to keep the weight down on the terrace below - adobe is very heavy! The frames will be filled with coloured glass.
Ed welds steel posts and supports in place.
Wooden eucalyptus tree beams are laid across the span of the roof.
Carmelo inspects the bolts to make sure none are missing.
View of the roof work from the upper terrace.
No comments:
Post a Comment