The stones are collected from the land and sorted to provide a level surface before being covered with reinforcing steel and then concrete.
The terrace is designed to follow the contours of the land, whilst channeling water to drains.
A view from the back of the house where water is already being channeled from the upper terrace to the gully below.
For now the terracing ends at the main entrance and will be completed once the pool is finished.
No comments:
Post a Comment